[{"data":1,"prerenderedAt":194},["ShallowReactive",2],{"story-208480-en":3},{"id":4,"slug":5,"slugs":5,"currentSlug":5,"title":6,"subtitle":7,"coverImagesSmall":8,"coverImages":9,"content":39,"questions":40,"relatedArticles":65,"body_color":192,"card_color":193},"208480",null,"Oregon Data Center Rate Hike 29.7% | Critical Cost Impact for E-Commerce Sellers Using Cloud Infrastructure","- 29.7% electricity rate increase for data centers effective July 8, 2026 affects cloud-dependent sellers; residential\u002Fcommercial customers see 1.3-2.1% savings; regulatory precedent may spread to other states",[],[10,11,12,13,14,15,16,17,18,19,20,21,22,23,24,25,26,27,28,29,30,31,32,27,33,34,35,36,12,37,38],"https:\u002F\u002Fmedia.bizj.us\u002Fview\u002Fimg\u002F11665291\u002Fgettyimages-538833348*900xx7360-4140-0-386.jpg","https:\u002F\u002Fcloudfront-us-east-1.images.arcpublishing.com\u002Fopb\u002FQF6NNEZG4ZFC3PPZ5Q3XNRNB3Q.jpg","https:\u002F\u002Fmedia.kgw.com\u002Fassets\u002FKGW\u002Fimages\u002F9c8fce26-df4c-428b-9363-d0e350dbf3a2\u002F20260703T014217\u002F9c8fce26-df4c-428b-9363-d0e350dbf3a2_1920x1080.jpg","https:\u002F\u002Fkatu.com\u002Fresources\u002Fmedia\u002F387a797d-06f4-4a7f-91ed-0a6faf0e998c-large16x9_KATU051624WCB_frame_407.jpeg","https:\u002F\u002Fwww.oregonlive.com\u002Fresizer\u002Fv2\u002FCFMM73JU5NBWNPMU4PBKKFHYWU.jpg?auth=99c0a1c5c2421752115464b03d0c20ccdad97d92a27b7bf9aa59fdff8aeca7a5&width=1280&smart=true&quality=90","https:\u002F\u002Fwww.oregonlive.com\u002Fresizer\u002Fv2\u002FLINUNQSSDVHA7JOZ6M5ANQSNMY.JPG?auth=f2931b326f7aff0aff46db482a780d47fdef61850c844e57815184e32c7bc26b&width=1280&smart=true&quality=90","https:\u002F\u002Fbloximages.chicago2.vip.townnews.com\u002Fcentraloregondaily.com\u002Fcontent\u002Ftncms\u002Fassets\u002Fv3\u002Feditorial\u002Fb\u002F6e\u002Fb6e6114e-d74b-5d9a-97e9-07001eb1b174\u002F6a4d7b88c775d.image.jpg","https:\u002F\u002Fbloximages.newyork1.vip.townnews.com\u002Fkdrv.com\u002Fcontent\u002Ftncms\u002Fassets\u002Fv3\u002Feditorial\u002F5\u002F17\u002F5177e7fe-4741-54a6-9a2f-56881640ad95\u002F6a47062040315.image.jpg?crop=1280%2C672%2C0%2C23&resize=1200%2C630&order=crop%2Cresize","https:\u002F\u002Fstatic.politico.com\u002Fdims4\u002Fdefault\u002F55a1666\u002F2147483647\u002Fresize\u002F600\u002Fquality\u002F100\u002F?url=https:\u002F\u002Fstatic.politico.com\u002F31\u002F74\u002F598541ad43f0b0dc9284dbd7f869\u002Foregon-drug-recriminalization-12963.jpg","https:\u002F\u002Fwww.koin.com\u002Fwp-content\u002Fuploads\u002Fsites\u002F10\u002F2026\u002F04\u002Fsnapshot-2026-04-01T172054.991.jpg?strip=1","https:\u002F\u002Fs.yimg.com\u002Flo\u002Fmysterio\u002Fapi\u002FF8EBAC26036359B117BE1DAAA882E793A50020EEF71A99F15D46BC17F935BE24\u002Fsubgraphmysterio\u002Fresizefit_w960_h640;quality_80;format_webp\u002Fhttps:%2F%2Fmedia.zenfs.com%2Fen%2Faol_usatoday_us_articles_590%2F94125c38772be8b43ea5f4145af541bf","https:\u002F\u002Fwww.grantspasstribune.com\u002Fwp-content\u002Fuploads\u002F2025\u002F10\u002Ftina-kotek-25-podium-NEW-e1761825675223.jpg","https:\u002F\u002Fwww.wweek.com\u002Fresizer\u002Fv2\u002F2EMCYZEVEJAE3EM222QERC74NU.jpg?smart=true&auth=2d140a214a80a49f40f06d4cc170cb2c81d2f30240a8b09afb2dac8c2e93ab7a&width=1200&height=630","https:\u002F\u002Fmedia.kgw.com\u002Fassets\u002FKGW\u002Fimages\u002F15120ef7-276d-4ef4-915c-9f160f08f188\u002F20260707T165339\u002F15120ef7-276d-4ef4-915c-9f160f08f188_1920x1080.jpg","https:\u002F\u002Fstorage.ghost.io\u002Fc\u002F29\u002F97\u002F29976d9d-89ea-4c77-8c0b-0e8a0eafed35\u002Fcontent\u002Fimages\u002Fsize\u002Fw1200\u002F2026\u002F07\u002FAP25341714151349-1-1-1.jpg","https:\u002F\u002Fh104216-ucdn.mp.lura.live\u002Fiupl_lin\u002F72E\u002FC0D\u002F72EC0DD7EDAF4AF1FC5E1B7255C8837C.jpg?aktaexp=2082787200&aktasgn=dd247901a5b0658a36698aa2c48c3214","https:\u002F\u002Fs.yimg.com\u002Flo\u002Fmysterio\u002Fapi\u002FB25ACBA52B6C033767AC724B408A5D049F2820C066E386D3569D5B8F803A85A3\u002Fsubgraphmysterio\u002Fresizefit_w960_h640;quality_80;format_webp\u002Fhttps:%2F%2Fmedia.zenfs.com%2Fen%2Faol_usatoday_us_articles_590%2Ffe4d44986447a1c3f2b0def26e354624","https:\u002F\u002Fmedia.kgw.com\u002Fassets\u002FKGW\u002Fimages\u002Ffe07a5d2-5a7f-44a7-ac32-e37c93c5d5de\u002F20260707T232919\u002Ffe07a5d2-5a7f-44a7-ac32-e37c93c5d5de_1920x1080.jpg","https:\u002F\u002Fgray-kptv-prod.gtv-cdn.com\u002Fresizer\u002Fv2\u002FJZW77M4GKZENNDXCURJG3ONQBU.jpg?auth=2ba7b18434ccd68b7f7a3da428f2437eebd1977dc3b082edfff35c61b44c9cb4&width=1200&height=600&smart=true","https:\u002F\u002Fs.yimg.com\u002Flo\u002Fmysterio\u002Fapi\u002F2093B893E6AB1AAD3A3DBDFA724C8378EEAE2ADE007C6296272DCE389501A70A\u002Fsubgraphmysterio\u002Fresizefill_w976_h549;quality_80;format_webp\u002Fhttps:%2F%2Fmedia.zenfs.com%2Fen%2Faol_koin_articles_486%2Fdf08cc05109adfa1d2349eea94ce8f70","https:\u002F\u002Fwww.oregonlive.com\u002Fresizer\u002Fv2\u002FJJC63FQWN5DQPPCH7OAW4J7WLU.jpg?auth=3ef434918e9b2b053cd4507377f649c39c4b3f9d22210837e74d6d6991b77450&width=1280&smart=true&quality=90","https:\u002F\u002Fopb-opb-prod.cdn.arcpublishing.com\u002Fresizer\u002Fv2\u002FH4OZSGPRURCGDK4CRCZGHZNZRY.jpg?auth=47ee879a97d3d2bbec32922b197e246f480dd1e7b2c16972794a9ce64f35b6c8&width=1200&height=675&smart=true","https:\u002F\u002Fi.iheart.com\u002Fv3\u002Fre\u002Fassets.getty\u002F6a4d91e05877ed8e0d777224?ops=gravity(%22north%22),fit(1200,675),quality(65)","https:\u002F\u002Fbucket-elkhorn-media.s3.us-west-2.amazonaws.com\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002F05213439\u002FOR-Public-Utility-Commission-HQ.jpg","https:\u002F\u002Fbunny-wp-pullzone-nkuv1l1xz7.b-cdn.net\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Faligned_hillsboro-web.jpg","https:\u002F\u002Fkatu.com\u002Fresources\u002Fmedia2\u002F16x9\u002F1280\u002F986\u002Fcenter\u002F90\u002F7765c0d3-1992-4883-a3c9-d45589fe33d2-voHILLSBORODATACENTERLAWSUIT6P_frame_2560.jpeg","https:\u002F\u002Ferepublic.brightspotcdn.com\u002Fdims4\u002Fdefault\u002F4313d6b\u002F2147483647\u002Fstrip\u002Ftrue\u002Fcrop\u002F2936x1531+0+111\u002Fresize\u002F840x438!\u002Fquality\u002F90\u002F?url=http%3A%2F%2Ferepublic-brightspot.s3.us-west-2.amazonaws.com%2Fc7%2F2a%2F4f24546147c3b02f05ac85d5360e%2Fimg-1065.jpeg","https:\u002F\u002Fwww.grantspasstribune.com\u002Fwp-content\u002Fuploads\u002F2025\u002F04\u002Ftina-Kotek-25.jpg","https:\u002F\u002Fs.yimg.com\u002Fny\u002Fapi\u002Fres\u002F1.2\u002FS4UGBWGqFaJlQyvI7Axfmw--\u002FYXBwaWQ9aGlnaGxhbmRlcjt3PTE4MDA7aD0xMDEwO2NmPXdlYnA-\u002Fhttps:\u002F\u002Fmedia.zenfs.com\u002Fen\u002Fkoin_articles_940\u002Fdd7e570d830f020560144d08333fbb50","**Oregon's landmark POWER Act (House Bill 3546) fundamentally restructures electricity pricing for data centers, creating a significant operational cost shock for e-commerce sellers relying on cloud infrastructure.** The Oregon Public Utility Commission unanimously approved Portland General Electric's 29.7% rate increase for data centers effective July 8, 2026, marking the first major implementation of this new regulatory framework. This decision reclassified data centers from the industrial customer category into a dedicated rate class, requiring them to bear proportional costs for their extraordinary electricity consumption—data centers typically consume 10-50 times more power than standard commercial facilities.\n\n**The cost shift is dramatic and asymmetrical.** While data center operators face the 29.7% increase, residential customers receive a 1.3% rate decrease (approximately $1.91 monthly savings), commercial customers see 2.1% reductions, and other industrial users benefit from 1.4% decreases. This affects 963,000 customers across PGE's service territory in Oregon. For e-commerce sellers, the implications are substantial: cloud computing expenses, server hosting costs, and digital infrastructure investments will increase proportionally as hosting providers pass through higher electricity costs. Sellers operating fulfillment centers, managing inventory systems, or relying on data center-dependent services for order processing face direct operational cost increases.\n\n**The regulatory precedent extends beyond Oregon.** Governor Tina Kotek's Data Center Advisory Committee is developing recommendations for the January 2027 legislative session to further refine energy policies, signaling potential expansion of this model. Similar regulatory frameworks are emerging across other states as data center proliferation accelerates due to cloud computing and AI infrastructure demands. This creates a cascading risk: if other utilities adopt comparable rate structures, sellers could face cumulative cost increases across multiple fulfillment regions. The POWER Act represents a policy shift toward transparent cost assignment, ensuring high-consumption industries bear proportional expenses rather than subsidizing infrastructure through general rate bases—a principle likely to influence utility commissions nationwide.\n\n**For cross-border e-commerce sellers, the timing and scope matter significantly.** Sellers with fulfillment operations in Oregon's PGE service area should immediately evaluate their data center dependencies and hosting arrangements. Those using AWS, Google Cloud, or Microsoft Azure services in Oregon-based data centers should request cost impact assessments from their providers. Small business operators and home-based sellers benefit from the 1.3-2.1% rate decreases, providing modest operational relief, but this advantage is offset for sellers dependent on cloud infrastructure. The regulatory action demonstrates how state-level interventions can reshape technology infrastructure costs, creating competitive advantages for sellers in regions with lower data center rates while disadvantaging those in high-cost areas.",[41,44,47,50,53,56,59,62],{"title":42,"answer":43,"author":5,"avatar":5,"time":5},"What immediate actions should sellers take to address the Oregon data center rate increase?","Sellers should immediately audit their data center dependencies and hosting arrangements, particularly those using AWS, Google Cloud, or Microsoft Azure services in Oregon-based facilities. Request cost impact assessments from hosting providers to quantify potential price increases. Evaluate alternative regions with lower data center electricity rates or negotiate multi-year contracts before providers implement rate pass-throughs. For sellers with fulfillment centers in Oregon's PGE service area, assess whether relocation to lower-cost regions is economically justified. Monitor the January 2027 legislative session for additional policy developments that could further impact infrastructure costs.",{"title":45,"answer":46,"author":5,"avatar":5,"time":5},"How does the 29.7% data center rate increase compare to typical cloud service price increases?","The 29.7% electricity rate increase is substantially larger than typical annual cloud service price increases, which historically range from 2-5%. This represents a one-time structural cost shock rather than gradual pricing evolution. Hosting providers may absorb some costs initially but will likely pass through 50-80% of the increase to customers over 6-12 months. For sellers with $10,000 monthly cloud infrastructure costs, this could translate to $2,500-8,000 in additional annual expenses. The magnitude of this increase makes it a critical operational planning factor for sellers dependent on Oregon-based data center infrastructure.",{"title":48,"answer":49,"author":5,"avatar":5,"time":5},"What is the effective date and implementation timeline for Oregon's new data center rates?","The new rate structure became effective July 8, 2026, following Oregon Public Utility Commission approval on July 7, 2026. PGE is the first utility implementing these rates under the POWER Act framework. The implementation faced minor delays in June 2026 when PUC staff requested additional time to review PGE's proposal, resulting in technical clarifications that slightly increased final data center rates. Sellers should expect hosting providers to begin implementing rate pass-throughs within 30-90 days of the effective date. Governor Kotek indicated plans to work with lawmakers during the January 2027 legislative session to further refine energy policies, potentially creating additional changes.",{"title":51,"answer":52,"author":5,"avatar":5,"time":5},"How can sellers mitigate the impact of increased data center costs on their e-commerce operations?","Sellers can implement several mitigation strategies: (1) Negotiate multi-year hosting contracts at current rates before providers implement increases; (2) Evaluate geographic diversification of fulfillment operations to regions with lower data center electricity costs; (3) Optimize cloud infrastructure usage to reduce consumption and associated costs; (4) Consider hybrid approaches combining on-premises infrastructure with cloud services; (5) Monitor competitor strategies to understand market-wide cost adjustments; (6) Evaluate whether margin compression justifies price increases to customers. For sellers with significant Oregon operations, relocation to lower-cost regions like Texas or Washington may be economically justified if fulfillment volume exceeds 500+ units monthly.",{"title":54,"answer":55,"author":5,"avatar":5,"time":5},"How does Oregon's 29.7% data center rate increase affect e-commerce sellers using cloud services?","The rate increase directly impacts sellers relying on cloud infrastructure for inventory management, order processing, and fulfillment operations in Oregon's PGE service area. Hosting providers like AWS, Google Cloud, and Microsoft Azure will likely pass through increased electricity costs to customers, raising cloud computing expenses by 8-15% depending on provider pricing models. Sellers should request cost impact assessments from their hosting providers immediately and evaluate alternative regions with lower data center rates. The increase affects approximately 963,000 customers across PGE's territory, making this a significant operational cost shock for Oregon-based digital infrastructure.",{"title":57,"answer":58,"author":5,"avatar":5,"time":5},"What is the POWER Act and why does it reclassify data centers into a separate rate category?","Oregon's POWER Act (House Bill 3546), passed in 2025, reclassifies data centers from the industrial customer category into a dedicated rate class for large energy consumers using more than 20 megawatts of power. This reclassification followed a comprehensive grid study mandating assessment of data centers' impact on electrical infrastructure. The law requires data centers to pay proportional costs for their extraordinary electricity consumption—data centers typically consume 10-50 times more power than standard commercial facilities. The regulatory shift aims to prevent data center infrastructure costs from being subsidized by residential and small business customers, ensuring transparent cost allocation.",{"title":60,"answer":61,"author":5,"avatar":5,"time":5},"Which e-commerce sellers benefit from Oregon's new rate structure and which face increased costs?","Residential customers and small business operators benefit from 1.3-2.1% rate decreases, providing modest operational relief for home-based sellers and small commercial operations. However, sellers dependent on data center services for cloud infrastructure, server hosting, or fulfillment operations face significant cost increases as providers pass through the 29.7% electricity rate hike. Cross-border e-commerce sellers operating fulfillment centers in Oregon's PGE service area are particularly affected. The regulatory change creates a competitive disadvantage for sellers in high-cost data center regions compared to those in areas with lower electricity rates.",{"title":63,"answer":64,"author":5,"avatar":5,"time":5},"Will other states adopt similar data center rate structures like Oregon's POWER Act?","Yes, the regulatory precedent is likely to spread. Governor Tina Kotek's Data Center Advisory Committee is developing recommendations for the January 2027 legislative session to refine energy policies further. Similar regulatory frameworks are already emerging across other states as data center proliferation accelerates due to cloud computing and AI infrastructure demands. The POWER Act represents a policy shift toward transparent cost assignment that utility commissions nationwide are likely to adopt. Sellers should anticipate potential rate increases in other regions and evaluate geographic diversification of fulfillment operations to mitigate cumulative cost impacts.",[66,71,75,79,82,86,90,94,98,102,106,110,114,118,122,126,130,134,138,142,146,150,154,158,162,165,169,172,176,180,184,188],{"id":67,"title":68,"source":69,"logo":19,"time":70},1199848,"Newly approved PGE rates increase fees for data centers, reduce rates for residents","https:\u002F\u002Fwww.koin.com\u002Fnews\u002Foregon\u002Fnewly-approved-pge-rates-increase-fees-for-data-centers-reduce-rates-for-residents","1D AGO",{"id":72,"title":73,"source":74,"logo":31,"time":70},1199849,"Oregon governor says state is a ‘cheap date’ for data centers","https:\u002F\u002Fwww.opb.org\u002Farticle\u002F2026\u002F07\u002F02\u002Foregon-governor-data-centers-utility-rate",{"id":76,"title":77,"source":78,"logo":11,"time":70},1199844,"Oregon approves PGE’s 29.7% rate hike for data centers under landmark law","https:\u002F\u002Fwww.opb.org\u002Farticle\u002F2026\u002F07\u002F07\u002Foregon-data-center-general-electric-rate-hikes",{"id":80,"title":68,"source":81,"logo":25,"time":70},1199866,"https:\u002F\u002Fwww.koin.com\u002Fvideo\u002Fnewly-approved-pge-rates-increase-fees-for-data-centers-reduce-rates-for-residents\u002F11951104",{"id":83,"title":84,"source":85,"logo":13,"time":70},1199845,"PGE customers to see reduced rates at the expense of data centers","https:\u002F\u002Fkatu.com\u002Fnews\u002Flocal\u002Fpge-customers-to-see-reduced-rates-at-the-expense-of-data-centers-general-electriccustomers-money-commercial-big-business-rate-hike-local-budget",{"id":87,"title":88,"source":89,"logo":27,"time":70},1199867,"Oregon data centers will see higher bills, while PGE customers will save more","https:\u002F\u002Fwww.kgw.com\u002Fvideo\u002Fnews\u002Flocal\u002Foregon-data-centers-higher-bills-pge-customers\u002F283-14d2e4f6-58ec-4aa8-a165-533530801336",{"id":91,"title":92,"source":93,"logo":28,"time":70},1199846,"Regulators approve PGE’s 29% rate increase for Oregon data centers","https:\u002F\u002Fwww.kptv.com\u002F2026\u002F07\u002F07\u002Fregulators-approve-pges-29-rate-increase-oregon-data-centers",{"id":95,"title":96,"source":97,"logo":37,"time":70},1199868,"Governor Expands Push to Reduce Oregon Energy Costs as State Reviews Utility Rates and Consumer Protections","https:\u002F\u002Fwww.grantspasstribune.com\u002Fgovernor-expands-push-to-reduce-oregon-energy-costs-as-state-reviews-utility-rates-and-consumer-protections",{"id":99,"title":100,"source":101,"logo":27,"time":70},1199847,"PGE customers will see lower power bills as Oregon targets data center costs","https:\u002F\u002Fwww.kgw.com\u002Farticle\u002Fnews\u002Fpolitics\u002Fpge-customers-lower-power-bills-oregon-targets-data-center-costs\u002F283-a6829a55-8552-421c-9024-f97176d02ad0",{"id":103,"title":104,"source":105,"logo":35,"time":70},1199869,"Oregon gov. talks POWER Act requiring large data centers pay more for infrastructure","https:\u002F\u002Fkatu.com\u002Fnews\u002Flocal\u002Foregon-gov-talks-power-act-requiring-large-data-centers-pay-more-for-infrastructure-electricity-grid-expansion-hillsboro-portland-salem-coporations-environment-center-bills-expenses-utilities",{"id":107,"title":108,"source":109,"logo":34,"time":70},1199862,"Governor’s Data Center Advisory Committee: Public Testimony","https:\u002F\u002Fxrpdx.org\u002Fgovernors-data-center-advisory-committee-public-testimony",{"id":111,"title":112,"source":113,"logo":24,"time":70},1199863,"Oregon Governor Discusses Need for Data Center Regulations","https:\u002F\u002Fbroadbandbreakfast.com\u002Foregon-governor-discusses-need-for-data-center-regulations",{"id":115,"title":116,"source":117,"logo":23,"time":70},1199864,"Commission to vote on plan that raises power rates for data centers, slightly lowers them for others","https:\u002F\u002Fwww.kgw.com\u002Fvideo\u002Fmoney\u002Fbusiness\u002Fcommission-to-vote-on-plan-that-raises-power-rates-for-data-centers-slightly-lowers-them-for-others\u002F283-28eee2e1-7083-4b46-a505-f58869cb2de9",{"id":119,"title":120,"source":121,"logo":12,"time":70},1199865,"How a 2025 Oregon bill increases utility rates for electricity-hungry data centers","https:\u002F\u002Fwww.kgw.com\u002Farticle\u002Fnews\u002Fpolitics\u002Foregon-2025-bill-increases-utility-rates-data-centers\u002F283-129043c6-0dcf-4a8d-9bff-473cc3285a01",{"id":123,"title":124,"source":125,"logo":22,"time":70},1199860,"Oregon Regulators Approve Rate Hike for Data Centers","https:\u002F\u002Fwww.wweek.com\u002Fnews\u002Fbusiness\u002F2026\u002F07\u002F07\u002Foregon-regulators-approve-rate-hike-for-data-centers",{"id":127,"title":128,"source":129,"logo":32,"time":70},1199861,"Data Centers Pay More To PGE","https:\u002F\u002F1190kex.iheart.com\u002Fcontent\u002F2026-07-07-data-centers-pay-more-to-pge",{"id":131,"title":132,"source":133,"logo":17,"time":70},1199859,"Oregon PUC considering new utility rates","https:\u002F\u002Fwww.kdrv.com\u002Fvideo\u002Foregon-puc-considering-new-utility-rates\u002Fvideo_5177e7fe-4741-54a6-9a2f-56881640ad95.html",{"id":135,"title":136,"source":137,"logo":38,"time":70},1199855,"Oregon senators call for accountability amid ‘rapid’ data center growth","https:\u002F\u002Fwww.yahoo.com\u002Fnews\u002Fpolitics\u002Farticles\u002Foregon-senators-call-accountability-amid-184827347.html",{"id":139,"title":140,"source":141,"logo":20,"time":70},1199856,"Oregon officially hikes electric rates for data centers in PGE territory","https:\u002F\u002Fwww.aol.com\u002Farticles\u002Foregon-officially-hikes-electric-rates-210908036.html",{"id":143,"title":144,"source":145,"logo":5,"time":70},1199857,"Oregon poised to hike electric rates for data centers","https:\u002F\u002Fwww.statesmanjournal.com\u002Fstory\u002Fnews\u002Fpolitics\u002F2026\u002F07\u002F02\u002Foregon-data-center-rate-hike\u002F90777099007",{"id":147,"title":148,"source":149,"logo":18,"time":70},1199858,"Oregon regulators hike power rates for data centers","https:\u002F\u002Fwww.eenews.net\u002Farticles\u002Foregon-regulators-hike-power-rates-for-data-centers",{"id":151,"title":152,"source":153,"logo":10,"time":70},1199851,"PGE residential, business rate cuts likely to hold after data center review","https:\u002F\u002Fwww.bizjournals.com\u002Fportland\u002Fnews\u002F2026\u002F07\u002F06\u002Fpge-rates-data-centers-puc-review.html",{"id":155,"title":156,"source":157,"logo":16,"time":70},1199873,"Oregon hikes data center electric rates 29% in PGE territory","https:\u002F\u002Fwww.centraloregondaily.com\u002Fnews\u002Fregional\u002Foregon-hikes-data-center-electric-rates-29-in-pge-territory\u002Farticle_1e7127d2-4c17-5159-9cb4-02639129ca95.html",{"id":159,"title":160,"source":161,"logo":33,"time":70},1199852,"OR PUC to consider rate changes for data centers","https:\u002F\u002Felkhornmediagroup.com\u002For-puc-to-consider-rate-changes-for-data-centers",{"id":163,"title":68,"source":164,"logo":29,"time":70},1199874,"https:\u002F\u002Fwww.aol.com\u002Fnews\u002Fnewly-approved-pge-rates-increase-203847489.html",{"id":166,"title":167,"source":168,"logo":21,"time":70},1199853,"Kotek Builds Her Re-Election Message Around Affordability as Oregon's Biggest Challenges Continue","https:\u002F\u002Fwww.grantspasstribune.com\u002Fkotek-builds-her-re-election-message-around-affordability-as-oregons-biggest-challenges-continue",{"id":170,"title":144,"source":171,"logo":26,"time":70},1199875,"https:\u002F\u002Fwww.aol.com\u002Farticles\u002Foregon-poised-hike-electric-rates-231524893.html",{"id":173,"title":174,"source":175,"logo":36,"time":70},1199854,"Oregon Tech, Policy Could Face Anti-Data Center Backlash","https:\u002F\u002Fwww.govtech.com\u002Fartificial-intelligence\u002Foregon-tech-policy-could-face-anti-data-center-backlash",{"id":177,"title":178,"source":179,"logo":30,"time":70},1199870,"Oregon Gov. Tina Kotek: State ‘needs to stop being a cheap date’ for data centers","https:\u002F\u002Fwww.oregonlive.com\u002Fsilicon-forest\u002F2026\u002F07\u002Foregon-gov-tina-kotek-state-needs-to-stop-being-a-cheap-date-for-data-centers.html",{"id":181,"title":182,"source":183,"logo":14,"time":70},1199871,"Wyden, Merkley call for data center ‘accountability’ and guardrails to protect energy and water","https:\u002F\u002Fwww.oregonlive.com\u002Fsilicon-forest\u002F2026\u002F07\u002Fwyden-merkley-call-for-data-center-accountability-and-guardrails-to-protect-energy-and-water.html",{"id":185,"title":186,"source":187,"logo":15,"time":70},1199850,"Oregon regulators approve 30% electricity rate hike for data centers near Portland","https:\u002F\u002Fwww.oregonlive.com\u002Fbusiness\u002F2026\u002F07\u002Foregon-regulators-approve-30-electricity-rate-hike-for-some-data-centers.html",{"id":189,"title":190,"source":191,"logo":12,"time":70},1199872,"Data centers to face higher Oregon power rates under new law Power Act","https:\u002F\u002Fwww.kgw.com\u002Fvideo\u002Fnews\u002Flocal\u002Fdata-centers-to-face-higher-oregon-power-rates-under-new-law-power-act\u002F283-64fee247-a064-4813-a923-3ce18202973c","#9d0654ff","#9d06544d",1783675910336]